This project involved the provision of consulting and labour for shaft excavation and directional drilling. It was an installation of a 2km sewerage line that ran east-west of the freeway into Donnybrook, Victoria. The sewerage line was 12m deep and was 900mm in diameter pipe size.

Project Information

LocationDonnybrook, VIC
Date2018 – 2019
ClientBothar Boring
Industry SectorUtilities
Project TypeSpecialised Labour
Construction TypeMicrotunnel