MELBOURNE
METRO
This project involved the partnership with Mass Transit Railway (MTR) which drove us to further refinements of the Melbourne Metro. Using our CPT, self-guided steering replaced channels and with landing gears, we could cross passage frames.
A conveyor enabled accurate placement and crafted a safe workplace. Prep work included crack inducer and dowel bar installation. We introduced satellite platforms to enable the placement and finishing to operate independenty.
Project Information
Location | Melbourne, VIC |
Date | 2020-2021 |
Client | Buoygues, John Holland & Lendlease |
Industry Sector | Rail |
Project Type | Equipment Supply |
Construction Type | Tunnel |
Length | Twin 4.4km |
Stations | 4 |
Super Elevation (max) | 0° |
Configuration of Machines | 110 – B |